19/11/2021

WP4 – Overall process design, industrial scale-up and demonstration

In WP4, the PYROCO2 process will be upscaled from the pre-pilot scale to the final demonstrator scale. This will be realized through designing, building, commissioning, and operation of the PYROCO2 TRL 7 demonstrator plant with the capacity to produce 4,000 t/a acetone with the corresponding downstream processing to achieve the production of liquid fuels and other chemical and material products depending on the requirement of the market.